“Even Calling Up 100,000 Reservists Would Not Be Enough”: Questions Over Effectiveness of UK Rearmament Plans Amid Training Gaps, Financial Strains and Defense Industry Decline
Authored On
Modified
UK conducts first review of strategic reserves since end of Cold War Training even existing troops proves difficult; restoring reserve forces would require substantial additional spending With UK defense industry in decline, rebuilding weapons supply chains is more urgent than securing personnel

The British government has urged former service personnel to prepare for possible wartime mobilization. With the military threat from Russia intensifying, it is overhauling a reserve management system largely neglected since the end of the Cold War in an apparent effort to secure the ability to mobilize troops in an emergency. Experts, however, believe Britain will struggle to restore meaningful warfighting capabilities in the short term, given the accumulation of structural problems, including insufficient defense funding, a shrinking defense industrial base, and disruptions to the supply and operation of weapons and equipment.
UK Launches Sweeping Review of Reserve Forces
According to Britain's Sky News on the 26th (all dates hereafter local time), the UK Ministry of Defence recently sent letters to former Army, Royal Navy and Royal Air Force personnel asking them to provide updated contact details, their current occupations and specialist skills acquired since leaving the military. This is reportedly the first time since the end of the Cold War that Britain has undertaken such a large-scale assessment of its reserve forces through letters issued in the names of the service chiefs. The letters also offered opportunities to volunteer for various military exercises, including NATO's large-scale Steadfast Defender exercise scheduled for next spring.
The letters specifically targeted members of Britain's strategic reserve, who have a legal obligation to return to military service in emergencies such as a national crisis, an attack on the homeland or the outbreak of war. According to The Times, the strategic reserve currently numbers about 95,000, but roughly 45,000 reportedly could not be reached because their information was missing or outdated. The Ministry of Defence maintains that sending the letters does not constitute an actual mobilization order. In an interview with Sky News that day, British Defence Secretary Wes Streeting described the move as “a sensible and necessary precaution as security threats intensify,” stressing that it was “something that should reassure the public rather than alarm them.”
Long-Term Erosion of Force Deployment Capabilities
Even if Britain overhauls its reserve management system, however, it remains uncertain whether it can quickly restore its ability to mobilize personnel in wartime. During the Cold War, the British armed forces required former service personnel to update their personal details and attend call-up training annually, and also mobilized reservists for major military exercises. A prominent example was Exercise Lionheart in 1984, which simulated a Soviet invasion of Western Europe and involved some 130,000 troops from NATO member countries, including 32,000 British Army reservists alone. At the time, the British military tested the full wartime reinforcement process, using civilian ships, aircraft and railways to transport troops and military supplies to continental Europe, where they joined units stationed there for simulated combat. After the Cold War ended, however, compulsory training and allowance payments for former service personnel were discontinued, and the strategic reserve has not been mobilized on a large scale since the 1991 Gulf War.
The large-scale exercises the British military has recently resumed have also proved insufficient to improve reservists' combat capabilities. According to the UK's reserve forces External Scrutiny Team (EST), Britain deployed about 20,000 Army, Royal Navy and Royal Air Force personnel to Steadfast Defender in 2024, but reservist participation was reportedly extremely limited. According to a response submitted to Parliament by the Ministry of Defence last month, no more than 1,000 strategic reservists will participate in next year's Steadfast Defender exercise, and even that participation will be voluntary and short-term.
Funding Shortages Force Training Cuts Even for Existing Troops
The British military is also struggling to maintain training for its existing personnel. Last September, The Guardian, the BBC and other outlets reported that the British Army had been instructed to suspend nonessential military training to save money. Training would continue as normal for units preparing for overseas deployment, units currently carrying out missions and rapid-response forces, while collective training would be sharply reduced for UK-based units without specific deployment schedules. Specifically, the British Army suspended major collective exercises involving 90 or more personnel to save GBP 30 million in operating costs, with exercises involving Challenger 2 main battle tanks and Apache attack helicopters also among those canceled. Reserve-related funding was reportedly cut by 10% as well.
The Ministry of Defence plans to invest GBP 2 billion over the next 15 years to modernize Army training and strengthen combat readiness. However, because the investment focuses on a long-term overhaul of the training system, it is unclear whether it can address the immediate shortage of operating funds. Moreover, turning the roughly 100,000-strong strategic reserve into a genuinely deployable force will require additional funding not only for call-up allowances and retraining, but also for securing weapons and equipment, procuring ammunition and fuel, and expanding training facilities.
Table 1. Constraints on Strengthening the British Military's Warfighting Capabilities
| Factor | Key Details | Impact on Wartime Readiness |
|---|---|---|
| Gap in Reservist Training | Compulsory call-up training for former service personnel discontinued after the Cold War | Difficulties turning recalled reservists into deployable forces |
| Funding Shortages | Collective training for regular personnel scaled back and reserve-related budgets cut to reduce operating costs | Pressure to secure funding needed to maintain training for existing troops and retrain reservists |
| Declining Defense Industrial Capacity | Shrinking production base leads to insufficient ammunition and equipment stockpiles and operational disruptions affecting key equipment | Constraints on replenishing military supplies and keeping equipment operational |
Defense Supply Chains Continue to Contract
The prolonged decline of Britain's defense industrial base is also seen as a problem. After the Cold War ended, Britain reduced troop numbers and weapons holdings on the assumption that a large-scale conventional war had become less likely, shifting the focus of its military strategy toward intervention in overseas conflicts and counterterrorism operations. As orders for new weapons declined in the process, British defense companies sharply reduced their production facilities and technical workforces. This situation became particularly apparent after the outbreak of the Russia-Ukraine war. For example, in November 2022, the Ministry of Defence sent British defense contractor BAE Systems a letter of intent to purchase additional 155 mm artillery shells. However, with no production line readily available for operation and negotiations over the cost of expanding production facilities dragging on, a final contract was not signed until July the following year.
The shrinking weapons production base has weakened Britain's warfighting capabilities. In a report published in February 2024, the House of Commons Defence Committee concluded that while the British military could conduct short-term overseas deployments and respond to crises, insufficient equipment and ammunition stockpiles made it difficult to sustain a prolonged, high-intensity, full-scale war. In March that year, the Commons Public Accounts Committee also identified a GBP 16.9 billion funding shortfall in the Ministry of Defence's 2023–2033 equipment procurement and maintenance plan. In response, the British government announced plans through its Strategic Defence Review (SDR) last June to invest a total of GBP 6 billion in ammunition, but a substantial amount of time is expected to pass before supplies actually increase.
Operational Setbacks Affect Key Weapons Systems
Repeated breakdowns of key assets have also exposed weaknesses in the British military's equipment management system. The British government previously spent a total of GBP 6.4 billion to build the Queen Elizabeth-class aircraft carriers HMS Queen Elizabeth and HMS Prince of Wales, commissioning them in 2017 and 2019, respectively. However, in August 2022, Prince of Wales developed a propeller shaft fault while heading to the United States and returned shortly after departure, requiring extensive repairs that continued into the following year. In February 2024, a fault in a propeller shaft coupling forced Queen Elizabeth to cancel its participation in Steadfast Defender, while last June, Prince of Wales again suffered a technical fault that disrupted its schedule for a joint NATO exercise.
Delays in bringing new weapons into service have also repeatedly plagued procurement. For example, the Ministry of Defence launched the Ajax development program in 2010 to replace aging armored reconnaissance vehicles, and in 2014 signed a GBP 5.522 billion contract with General Dynamics to acquire 589 vehicles. However, the planned operational deployment date was pushed back from 2017 to 2020. Further safety issues, including hearing damage among personnel caused by excessive noise and vibration, subsequently led to the suspension of payments to the developer from December 2020 to March 2023. Following design changes and safety checks, the ministry declared initial operating capability (IOC) last November. However, all training was halted after 35 personnel reported symptoms related to noise and vibration during an exercise involving 23 armored vehicles on the 22nd of that month. The initial operating capability declaration was also put on hold this January.